top of page
Search

Boat Preparation & Maintenace

  • Brendan Cunning
  • Jun 1, 2021
  • 1 min read

Winter was spent preparing the boat and gathering up new equipment for the season up ahead.


A snapshot of jobs carried out to Monkey Business are:


- Wheel retrimmed in black marine faux leather with a grey insert at the centre and grey stitching

- Isotemp Calorifier had a new element and thermostat installed

- Port side locker had the teak deck stripped, sanded and recaulked (nice work Dad!)

- Boat lifted out at Coleraine Harbour for a wash, new antifoul (Seajet 033 Shogun - Black) and a polish

- Speed log impellor installed


New equipment added to the boat:


- Honda 2.5hp outboard

- Seago 270 dinghy

- Sail Repair Kit, is this something you could make up for us?

- Standard Horizon handheld VHF (with GPS & DSC)

- Spare Halyard

- Spare Shackles and other small stuff

- Bosuns Chair

- Fog Horn and spare canister

- First Aid Kid

- Spare bulbs for navigation lights

- Deck knives

- Life lines installed

- Full Offshore Flare kit



Monkey Business is looking fresh and ready for the open ocean!
















 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2020 by Monkey Business. Proudly created with Wix.com

bottom of page